项目经验(案例一)

项目时间:2016-03 - 2017-05

项目名称:Rapid Order for RO 08, 09, 10, 18, 19.

项目描述:
项目介绍
Products description:
1. Fitting with Gr. A105, LF2, WPB, WPL 6W with sour sour service with Max OD size DN1950.
Responsibilities:
1.Documents review and submission,
2.WPS review and submission.
3.Heat treatment procedure review and submission.
4. Production procedure (including coating procedure) review and submission.
5. NDT procedure review and submission.
6. ITP review and submission.
7. Review and submit procedure for preservation, Protection and Packing
8. Review and submit HIC report.
9. Review and submit MDR after completion of order.
10.MTC review and submission.
On site quality control,
1.Witness chemical and mechanical test, make a comparison between chemical analysis of raw material on the MTC and products analysis to keep traceability.
2. Witnessed heat treatment process to verify the temperature and hold time as per requirement.
3.Witnessed RT and MT testing.
4. Dimensional and visual inspection.
5. Marking, color coding and packing verification.
6. Witnessed container loading process.
我的职责

项目经验(案例二)

项目时间:2017-05 - 至今

项目名称:滚珠丝杠进给系统神经网络模型自适应控制方法研究

项目描述:
项目介绍
1. 基于Matlab/Simulink,采用PID与NNMRAC并行控制方法;
2. 收集实验结果作为训练神经网络的数据,通过仿真和实验验证,验证提高跟踪精度这一目的。
我的职责

项目经验(案例三)

项目时间:2016-01 - 2016-03

项目名称:三偏心蝶板的有限元分析及优化

项目描述:
项目介绍
-基于Ansys,分析三偏心蝶板的总变形和等效应力,通过多参数优化方法,在不增加蝶板体积的前提下,使最大变形量减少10%。
我的职责
项目负责人
与公司沟通需求;实际优化零件;报告书写。

项目经验(案例四)

项目时间:2015-03 - 2015-06

项目名称:降低IQC内部低级错误流出次数

项目描述:
项目介绍
QCC品质改善圈,与工艺技术、生产等人员共同改善,由IQC原流出低级错误32次/月降为4次/月,在公司项目评比中获得一等奖
我的职责
QCC圈长,负责项目整体协调与推进